Deployment

Deployment

Getting the finished project into the machine — and keeping the panel safe while it happens. The program goes into an inactive slot, is verified, and only then activated: a failed download leaves the old program running, so a download cannot brick a panel.

  • Download to the panel — USB and network transfer, the dual-slot dance, what is verified and when the runtime must be flashed
  • Licensing — what is free to try, what is paid, and how a licence is entered
Tags